Laserfiche WebLink
IRCJ INFIRMARY TIME EXTENSION ANALYSIS <br /> May- 07 <br /> DAYS IMPACTED: 15 <br /> WEATHER: 2 Days of rain greater than 1/4 inch . Delayed Infirmary Roofing <br /> 1 Days of recovery due to heavy amounts of rain <br /> UNFORESEEN CONDITIONS: 12 Existing wall and sequence of installation for new structural support members <br /> forthat wall did not allow new MC Channel structural support members to be <br /> fastened flush with wall and ceiling as designed. This required field inspection <br /> and redesign by Structural Engineer and rework of MC Channel fasteners <br /> Continued into June , <br /> June - 07 <br /> DAYSIMPACTED: 4 <br /> WEATHER: 0 <br /> 0 <br /> UNFORESEEN CONDITIONS: 4 Existing wall and sequence of installation did not allow new MC Channel <br /> structural support members to be fastened flush with wall and ceiling as <br /> designed This required field inspection and redesign by Structural Engineer <br /> and rework of MC Channel fasteners. Work delayed final slab area to be <br /> poured and masonry installation. Delay continued into June <br /> JulywV <br /> DAYS IMPACTED: 16 <br /> WEATHER: 0 <br /> 0 <br /> UNFORESEEN CONDITIONS: 12 Location of new exhaust duct work conflicted with second floor office space <br /> requiring revised location be determined . New location required fabrication of <br /> new duct work and relocating utility lines already installed <br /> 4 Existing floor conditions require floor leveling to be performed to allow for proper <br /> sloping of drains and level floors . - <br /> Page 8 of 8 <br />