My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-258
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-258
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2016 12:25:28 PM
Creation date
9/30/2015 11:01:41 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
07/24/2007
Control Number
2007-258
Agenda Item Number
7.H.
Entity Name
Peter R. Brown Construction
Subject
IRC Jail Expansion - time extension
Change Order 13
Area
4055 41st. Ave. IRC Jail
Project Number
2089
Supplemental fields
SmeadsoftID
6483
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRCJ INFIRMARY TIME EXTENSION ANALYSIS <br /> May- 07 <br /> DAYS IMPACTED: 15 <br /> WEATHER: 2 Days of rain greater than 1/4 inch . Delayed Infirmary Roofing <br /> 1 Days of recovery due to heavy amounts of rain <br /> UNFORESEEN CONDITIONS: 12 Existing wall and sequence of installation for new structural support members <br /> forthat wall did not allow new MC Channel structural support members to be <br /> fastened flush with wall and ceiling as designed. This required field inspection <br /> and redesign by Structural Engineer and rework of MC Channel fasteners <br /> Continued into June , <br /> June - 07 <br /> DAYSIMPACTED: 4 <br /> WEATHER: 0 <br /> 0 <br /> UNFORESEEN CONDITIONS: 4 Existing wall and sequence of installation did not allow new MC Channel <br /> structural support members to be fastened flush with wall and ceiling as <br /> designed This required field inspection and redesign by Structural Engineer <br /> and rework of MC Channel fasteners. Work delayed final slab area to be <br /> poured and masonry installation. Delay continued into June <br /> JulywV <br /> DAYS IMPACTED: 16 <br /> WEATHER: 0 <br /> 0 <br /> UNFORESEEN CONDITIONS: 12 Location of new exhaust duct work conflicted with second floor office space <br /> requiring revised location be determined . New location required fabrication of <br /> new duct work and relocating utility lines already installed <br /> 4 Existing floor conditions require floor leveling to be performed to allow for proper <br /> sloping of drains and level floors . - <br /> Page 8 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.