Laserfiche WebLink
IRC JAIL INTAKE BUILDING TIME EXTENSION ANALYSIS <br /> February-07 <br /> DAYSIMPACTED: 0 <br /> WEATHER: 0 <br /> 0 <br /> March - 07 <br /> DAYSIMPACTED: 0 <br /> WEATHER: 0 <br /> 0 <br /> April - 07 <br /> DAYSIMPACTED: 11 <br /> WEATHER: 2 Days of rain greater than 114 inch. A section of the Intake H building was not <br /> 1 Days of recovery due to heavy amounts of rain <br /> UNFORESEEN CONDITIONS: 4 RFIs 157 & 158 Existing concrete structural members conflict with new <br /> structural support member installation <br /> 3 Structural review of existing sally port concrete slab required demotion and <br /> replacement of slab due to unknown conditions of sub grade . Per plans new <br /> slab was to be poured on tap of existing In addition while performing demolition <br /> unknown storm line was damaged and required replacement <br /> 1 Existing fire sprinkler lines required by Fire Marshal to be replaced since we <br /> were fabricated from plastic piping and is not per updated Fire Protection <br /> Codes <br /> May- 07 <br /> DAYSIMPACTED: 3 <br /> WEATHER: 2 Days of rain greater than 114 inch . Delayed Intake Footings Slab and Masonry <br /> 1 Days of recovery due to heavy amounts of rain <br /> June - 07 <br /> DAYSIMPACTED: 7 <br /> WEATHER: 3 Days of rain greater than 114 inch . Delayed Intake Steel and Roofing <br /> 0 <br /> UNFORESEEN CONDITIONS: 4 Existing duct work found to contain broken seal and air conditioning unit not <br /> functional both requiring replacement. <br /> Page 3 of 8 <br />