My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-258
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-258
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2016 12:25:28 PM
Creation date
9/30/2015 11:01:41 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
07/24/2007
Control Number
2007-258
Agenda Item Number
7.H.
Entity Name
Peter R. Brown Construction
Subject
IRC Jail Expansion - time extension
Change Order 13
Area
4055 41st. Ave. IRC Jail
Project Number
2089
Supplemental fields
SmeadsoftID
6483
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC JAIL INTAKE BUILDING TIME EXTENSION ANALYSIS <br /> February-07 <br /> DAYSIMPACTED: 0 <br /> WEATHER: 0 <br /> 0 <br /> March - 07 <br /> DAYSIMPACTED: 0 <br /> WEATHER: 0 <br /> 0 <br /> April - 07 <br /> DAYSIMPACTED: 11 <br /> WEATHER: 2 Days of rain greater than 114 inch. A section of the Intake H building was not <br /> 1 Days of recovery due to heavy amounts of rain <br /> UNFORESEEN CONDITIONS: 4 RFIs 157 & 158 Existing concrete structural members conflict with new <br /> structural support member installation <br /> 3 Structural review of existing sally port concrete slab required demotion and <br /> replacement of slab due to unknown conditions of sub grade . Per plans new <br /> slab was to be poured on tap of existing In addition while performing demolition <br /> unknown storm line was damaged and required replacement <br /> 1 Existing fire sprinkler lines required by Fire Marshal to be replaced since we <br /> were fabricated from plastic piping and is not per updated Fire Protection <br /> Codes <br /> May- 07 <br /> DAYSIMPACTED: 3 <br /> WEATHER: 2 Days of rain greater than 114 inch . Delayed Intake Footings Slab and Masonry <br /> 1 Days of recovery due to heavy amounts of rain <br /> June - 07 <br /> DAYSIMPACTED: 7 <br /> WEATHER: 3 Days of rain greater than 114 inch . Delayed Intake Steel and Roofing <br /> 0 <br /> UNFORESEEN CONDITIONS: 4 Existing duct work found to contain broken seal and air conditioning unit not <br /> functional both requiring replacement. <br /> Page 3 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.