Laserfiche WebLink
CDM will review and refine, if necessary, the stormwater models developed by Carter <br /> Associates Inc . for the existing and proposed conditions of the C-5 canal subbasin. It is assumed <br /> that the level of effort to refine the stormwater model will not be significant. <br /> CDM will develop a layout of the Phase 1 Stormwater System for the Northern Expansion area . <br /> The Phase 1 stormwater system will provide stormwater conveyance for 10 acres of area <br /> dedicated to a mulching area and 10 acres of C&D unlined landfill area which discharges to a <br /> portion of Pond 2 . <br /> Subtask 240 ERP Application Preparation <br /> This subtask includes preparation of the deliverables described above for Task 200 including the <br /> permit application and all supporting information. Environmental considerations include <br /> results of wildlife surveys, and evaluation of how onsite wetland water quantity, water quality, <br /> hydroperiod and habitat will be maintained, a mitigation plan (addressing impact <br /> compensation, construction, monitoring, and cost) , wetland jurisdictional determinations and <br /> an impact summary table . <br /> The plans must include specifications, cross section and profile views, project boundaries, <br /> existing and proposed land use cover (wetlands, surface waters, and uplands), site topography, <br /> flood plain boundaries, and wetland boundaries . <br /> The plans must also indicate proposed impacts to wetlands and surface waters, proposed <br /> connection/ outfalls to wetlands and surface waters, proposed buffer zones, pre- and post <br /> development drainage patterns, basin boundaries and runoff routing, design of water <br /> management facilities, rights-of-way (ROW), erosion/ sediment and turbidity control measures, <br /> mitigation plan details, site grading details, temporary and permanent disposal sites for <br /> excavated materials, and dewatering plan details . <br /> A projected construction schedule, and a description of construction techniques, sequencing <br /> and equipment must be provided . The methods of excavation, type of excavated material, and <br /> source and type of fill material must also be described . <br /> Subtask 250 USACE Individual Permit Application Preparation <br /> CDM will prepare a USACE IP application for submittal to the USACE. This application will <br /> include information regarding the proposed filling of wetlands within the jurisdiction of <br /> USACE on the Northern Expansion Area property . <br /> Subtask 260 FDEP ERP Requests for Additional Information <br /> CDM will respond to up to two Requests for Additional Information (RAIs) from FDEP <br /> regarding the Conceptual ERP Permit Application. It is not anticipated that the required effort <br /> will be significant. <br /> B -5 rb4508.doc <br />