My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-007
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2016 1:47:31 PM
Creation date
9/30/2015 7:12:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Authorization
Approved Date
01/06/2004
Control Number
2004-007
Agenda Item Number
14.B.4
Entity Name
Camp Dresser & McKee
SWDD
Subject
Work Authorization No. 24 Phase II Permitting
Northern Expansion Property
Area
C-5 Canal
Project Number
9901-24
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3581
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CDM will review and refine, if necessary, the stormwater models developed by Carter <br /> Associates Inc . for the existing and proposed conditions of the C-5 canal subbasin. It is assumed <br /> that the level of effort to refine the stormwater model will not be significant. <br /> CDM will develop a layout of the Phase 1 Stormwater System for the Northern Expansion area . <br /> The Phase 1 stormwater system will provide stormwater conveyance for 10 acres of area <br /> dedicated to a mulching area and 10 acres of C&D unlined landfill area which discharges to a <br /> portion of Pond 2 . <br /> Subtask 240 ERP Application Preparation <br /> This subtask includes preparation of the deliverables described above for Task 200 including the <br /> permit application and all supporting information. Environmental considerations include <br /> results of wildlife surveys, and evaluation of how onsite wetland water quantity, water quality, <br /> hydroperiod and habitat will be maintained, a mitigation plan (addressing impact <br /> compensation, construction, monitoring, and cost) , wetland jurisdictional determinations and <br /> an impact summary table . <br /> The plans must include specifications, cross section and profile views, project boundaries, <br /> existing and proposed land use cover (wetlands, surface waters, and uplands), site topography, <br /> flood plain boundaries, and wetland boundaries . <br /> The plans must also indicate proposed impacts to wetlands and surface waters, proposed <br /> connection/ outfalls to wetlands and surface waters, proposed buffer zones, pre- and post <br /> development drainage patterns, basin boundaries and runoff routing, design of water <br /> management facilities, rights-of-way (ROW), erosion/ sediment and turbidity control measures, <br /> mitigation plan details, site grading details, temporary and permanent disposal sites for <br /> excavated materials, and dewatering plan details . <br /> A projected construction schedule, and a description of construction techniques, sequencing <br /> and equipment must be provided . The methods of excavation, type of excavated material, and <br /> source and type of fill material must also be described . <br /> Subtask 250 USACE Individual Permit Application Preparation <br /> CDM will prepare a USACE IP application for submittal to the USACE. This application will <br /> include information regarding the proposed filling of wetlands within the jurisdiction of <br /> USACE on the Northern Expansion Area property . <br /> Subtask 260 FDEP ERP Requests for Additional Information <br /> CDM will respond to up to two Requests for Additional Information (RAIs) from FDEP <br /> regarding the Conceptual ERP Permit Application. It is not anticipated that the required effort <br /> will be significant. <br /> B -5 rb4508.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.