Laserfiche WebLink
COUNTY will supply application fees for the required federal state and local permits . The <br /> COUNTY will prepare site plan applications for the North and South Relief Canal sites . <br /> Additionally, the COUNTY will prepare bidding documents , contract documents , and <br /> Division 1 of the technical specifications . The COUNTY will provide the ENGINEER' s <br /> architect with a draft floor plan of the Main Relief Canal Operations Building . <br /> SECTION III - SCOPE OF SERVICES PROVIDED BY THE ENGINEER <br /> A. PROJECT ASSIGNMENTS - The "design team " is collectively comprised of Carter <br /> Associates , Inc . ( CAI ) , Environmental Consulting & Technology , Inc . ( ECT) , and <br /> CDS Technologies , Inc . (CDS ) . In general , the individual team assignments are <br /> listed on Attachment 1 , included herein . <br /> Be GENERAL - The pollution control systems covered by this Work Order are intended <br /> to remove pollutants (floating and suspended solids and their associated nutrients ) <br /> from the waters of the Main , South , and North Relief Canals . The projects ' purpose <br /> is to protect the water quality of the Indian River Lagoon and thereby aid in restoring <br /> the Lagoon ' s seagrass coverage . <br /> C . LAND SURVEYING SERVICES - CAI shall prepare the Land Surveying Work <br /> Product ( Survey Work Product) and the design team will use the Survey Work <br /> Product for designing and permitting the stormwater treatment facilities . The Survey <br /> Work Product shall contain all information necessary for a third - party land surveyor <br /> to independently recreate the survey work. Also , the Survey Work Product shall <br /> contain all information necessary for the complete design of each pollution control <br /> system , even though such surveying services may not be specifically discussed <br /> below. <br /> 1 . The Survey Work Product <br /> The Survey Work Product must meet or exceed the following minimum <br /> standards : <br /> a . Drawing Requirements - As a minimum for each site , the survey <br /> drawing set will consist of ( 1 ) Boundary Survey and Survey Control <br /> Map , (2 ) Topographic Survey ( including canal cross-sections ) . Use <br /> multiple pages for each as necessary . Minimum drafting standards <br /> for all Drawings are : <br /> ( 1 ) Prepare and supply an electronic disc at completion of all <br /> Drawings using AutoCAD Release 2000 or later . <br /> (2 ) Drawing Scale — Except for the overall plan view sheet and <br /> unless otherwise approved in writing by the COUNTY , the <br /> horizontal scale shall be 1 "=20 ' or larger (e . g . 1 " = 10 ' , 1 " = 51 ) . <br /> Use matchlines as appropriate . The overall plan view sheet <br /> FAPublic Works\KeithM\Stormwater ProjectsTast aC\Contracts\Consultant Contract with Carter & Associates\Work Order No. 5 - Final Design <br /> of Vortex System\Work Order #5 - Rev. May 3 , 2004.doc <br /> 2 <br />