Laserfiche WebLink
sections from Divisions 2 through 16 , inclusive , using the Construction <br /> Specification Institute (CSI ) format . Submit the Technical Specifications with <br /> the 75 percent review submittal . Provide the COUNTY with one hardcopy of <br /> all specifications for review by the COUNTY and Malcolm Pirnie , Inc . <br /> Technical Specifications type shall meet the following criteria : <br /> ( 1 ) Microsoft Word Format <br /> (2 ) Arial font , size 12 <br /> ( 3 ) Full justification <br /> (4 ) Follow the layout per an example provided by the COUNTY. <br /> After the COUNTY has approved the Technical Specifications , provide the <br /> COUNTY with one hard copy of the Technical Specifications , and with one <br /> electronic copy on 3 . 5-inch disks or CD . <br /> 5 . Bid Quantities - On or before the tenth day after the COUNTY approves the <br /> ENGINEER' s final construction design/drawing submittal , prepare and submit <br /> bid quantities to the COUNTY . Provide the COUNTY with one hardcopy and <br /> one electronic copy on a 3 . 5-inch disk or CD . The bid quantities shall be in <br /> the following format: <br /> a . Microsoft Word ( not Excel ) <br /> b . Arial font, size 12 <br /> c . Tabulation format : <br /> ITEM No . DESCRIPTION IQUANTITY UNIT <br /> 6 . Opinion of Probable Construction Cost - On or before the tenth day after <br /> the COUNTY approves the ENGINEER' S final construction design submittal , <br /> prepare and submit an Engineer' s Opinion of Final Construction Cost to the <br /> COUNTY . Provide the COUNTY with one hardcopy, and one electronic copy <br /> on a 3 . 5- inch disk or CD . The Opinion of Final Construction Cost shall be in <br /> the following format: <br /> ( 1 ) Microsoft Excel <br /> (2 ) Arial font , size 12 <br /> 3 Tabulation format : <br /> ITEM No , DESCRIPTION QUANTITY UNIT JUNIT TOTAL <br /> PRICE AMOUNT <br /> 7 , Permit Applications and Responses to Agency Questions — Assist the <br /> COUNTY in applying for the following permits : ( 1 ) U . S . Army Corps of <br /> Engineers permits ; (2 ) U . S . Coast Guard permits ( if necessary) ; (3 ) <br /> SJRWMD Environmental Resource permits , (4 ) Driveway permits from <br /> FDOT for connection to U . S . Highway 1 for the North Relief Canal Structure , <br /> ( 5 ) Driveway permits from the COUNTY for connection to Old Dixie Highway <br /> for the North and South Relief Canal Structures , ( 6 ) Indian River Farms <br /> Water Control District Permits , and ( 7 ) the City of Vero Beach Site Plan <br /> FAPublic Works\KeithM\Stonnwater Projects\East IRC\Contracts\Consultant Contract with Carter & Associates\Work Order No. 5 - Final Design <br /> of Vortex System\Work Order #5 - Rev. May 3 , 2004.doc <br /> 7 <br />