My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-112
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2016 11:51:09 AM
Creation date
9/30/2015 7:34:18 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/11/2004
Control Number
2004-112
Agenda Item Number
11.I.2
Entity Name
Carter Associates
Subject
Work Order No.5
Final design services Stormwater Pollution Control System
Area
Main Relief, South Relief, and North Relief Canal
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3770
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sections from Divisions 2 through 16 , inclusive , using the Construction <br /> Specification Institute (CSI ) format . Submit the Technical Specifications with <br /> the 75 percent review submittal . Provide the COUNTY with one hardcopy of <br /> all specifications for review by the COUNTY and Malcolm Pirnie , Inc . <br /> Technical Specifications type shall meet the following criteria : <br /> ( 1 ) Microsoft Word Format <br /> (2 ) Arial font , size 12 <br /> ( 3 ) Full justification <br /> (4 ) Follow the layout per an example provided by the COUNTY. <br /> After the COUNTY has approved the Technical Specifications , provide the <br /> COUNTY with one hard copy of the Technical Specifications , and with one <br /> electronic copy on 3 . 5-inch disks or CD . <br /> 5 . Bid Quantities - On or before the tenth day after the COUNTY approves the <br /> ENGINEER' s final construction design/drawing submittal , prepare and submit <br /> bid quantities to the COUNTY . Provide the COUNTY with one hardcopy and <br /> one electronic copy on a 3 . 5-inch disk or CD . The bid quantities shall be in <br /> the following format: <br /> a . Microsoft Word ( not Excel ) <br /> b . Arial font, size 12 <br /> c . Tabulation format : <br /> ITEM No . DESCRIPTION IQUANTITY UNIT <br /> 6 . Opinion of Probable Construction Cost - On or before the tenth day after <br /> the COUNTY approves the ENGINEER' S final construction design submittal , <br /> prepare and submit an Engineer' s Opinion of Final Construction Cost to the <br /> COUNTY . Provide the COUNTY with one hardcopy, and one electronic copy <br /> on a 3 . 5- inch disk or CD . The Opinion of Final Construction Cost shall be in <br /> the following format: <br /> ( 1 ) Microsoft Excel <br /> (2 ) Arial font , size 12 <br /> 3 Tabulation format : <br /> ITEM No , DESCRIPTION QUANTITY UNIT JUNIT TOTAL <br /> PRICE AMOUNT <br /> 7 , Permit Applications and Responses to Agency Questions — Assist the <br /> COUNTY in applying for the following permits : ( 1 ) U . S . Army Corps of <br /> Engineers permits ; (2 ) U . S . Coast Guard permits ( if necessary) ; (3 ) <br /> SJRWMD Environmental Resource permits , (4 ) Driveway permits from <br /> FDOT for connection to U . S . Highway 1 for the North Relief Canal Structure , <br /> ( 5 ) Driveway permits from the COUNTY for connection to Old Dixie Highway <br /> for the North and South Relief Canal Structures , ( 6 ) Indian River Farms <br /> Water Control District Permits , and ( 7 ) the City of Vero Beach Site Plan <br /> FAPublic Works\KeithM\Stonnwater Projects\East IRC\Contracts\Consultant Contract with Carter & Associates\Work Order No. 5 - Final Design <br /> of Vortex System\Work Order #5 - Rev. May 3 , 2004.doc <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.