My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-317
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-317
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2016 2:01:22 PM
Creation date
10/1/2015 12:41:34 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/23/2008
Control Number
2008-317
Agenda Item Number
12.J.5
Entity Name
Boyle Engineering Corp.
Subject
College Lane Water Main Privity Agreement
Supplemental fields
SmeadsoftID
7617
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
One sample delive e will be submitted for review aj comment prior to final <br /> submittal . Schedule assumes review and comment of sample deliverable are received <br /> within 5 days . <br /> 2. 15 Service During Construction (Phase 60 ) : The Engineer and sub -consultants shall <br /> perform the following construction related services as required by the Indian River <br /> County , Indian River Farms Water Control District and SJRWMD . The Engineer will <br /> perform periodic inspections of the construction activities for the purposes of observing <br /> the progress and quality of the work, and to determine whether or not the work is <br /> proceeding in accordance with the construction drawings and specifications . This effort <br /> is directed toward providing the College a greater degree of confidence that the <br /> completed project will conform to the requirements contained in the approved drawings , <br /> specifications and regulatory agency permits and will enable Engineer to prepare <br /> construction certifications of the completed work to permitting agencies . <br /> At the conclusion of the work , Engineer will prepare certifications of the completed work <br /> based on certified record drawing information prepared by a Florida licensed Professional <br /> Surveyor and Mapper that is to be retained by the site development contractor. <br /> The Engineer has no control over the College ' s selection of a contractor, weather, work <br /> stoppages , material shortages , and the quality of the contractor' s work or the sequencing <br /> of time . Therefore , it is understood that the following scope of work and associated fees <br /> are estimates only . The Engineer' s services under this section shall include : <br /> 1 . Pre -Construction Meeting: The Engineer shall attend a pre-construction meeting <br /> with the College, the College ' s contractor and other applicable agencies and <br /> public utilities prior to the commencement of construction . The Engineer shall <br /> issue plans for construction to the contractor at this time . Note that the Engineer <br /> shall be listed as an additional named insured by the contractor' s insurer for all <br /> construction related to this project . <br /> 2 . Shot) Drawings : The Engineer shall review shop drawings for any components <br /> related to the improvements designed by the Engineer. Shop drawings shalt be <br /> forwarded to applicable agencies and public utilities for their final review and <br /> approval , as necessary . <br /> 3 . Limited Construction Observation . The Engineer, by providing limited <br /> construction observation services , shall make site visits to observe the <br /> construction of improvements such that an engineering certification can be made <br /> regarding the construction of the proposed improvements . The purpose of the <br /> limited project representation is to provide construction observation of the <br /> progress and quality of the construction work , and to determine , in general , if the <br /> construction is proceeding in accordance with the contract documents . The <br /> services provided are not intended to be comprehensive or exhaustive in nature , <br /> IRCC-Assignment Authorization. March 2006 05-0351 <br /> Mueller Campus College Lane Roadway Extension & Bridge Construction 8 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.