My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-313a
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-313a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2016 12:25:31 PM
Creation date
9/30/2015 9:07:32 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/13/2005
Control Number
2005-313A
Agenda Item Number
11.I.
Entity Name
Ranger Construction Industries
Subject
Intersection improvements/part 2
Sidewalk & Drainage improvements
Area
41st. St. widening Dodgertown Elementary
Supplemental fields
SmeadsoftID
5167
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
err <br /> C . The pollution control measures specified herein represent minimum <br /> standards to be adhered to by the CONTRACTOR throughout the <br /> Project' s construction . The OWNER reserves the right to require the <br /> CONTRACTOR to employ additional pollution control measures , when in <br /> the sole opinion of the OWNER , they are warranted . If site specific <br /> conditions require additional erosion and stormwater pollution control <br /> measures during any phase of construction or operation to prevent <br /> erosion or to control sediment or other pollution , beyond those specified in <br /> the Drawings or herein , implement additional best management practices <br /> as necessary , in accordance with Chapter 4 , " Best Management Practices <br /> for Erosion and Sedimentation Control " of the Florida Erosion and <br /> Sediment Control Inspector' s Manual , included herein in Appendix " B " . <br /> D . The OWNER may terminate this Contract if the CONTRACTOR fails to <br /> comply with this Section . Alternatively , the OWNER may halt the <br /> CONTRACTOR' s operations until the CONTRACTOR is in full compliance <br /> with this Section . If the OWNER . halts the CONTRACTOR' s work as a <br /> result of its failure to comply with this Section , the Construction Contract <br /> time clock will continue to run . <br /> E . In addition to these Specifications , comply with Chapter 4 , " Best <br /> Management Practices for Erosion and Sedimentation Control " of the <br /> Florida Erosion and Sediment Control Inspector' s Manual , included herein .. <br /> in Appendix " B . " If there is a conflict between the referenced Chapter 4 <br /> and these Specifications , the more stringent requirement shall prevail . <br /> 1 . 2 SOME PERMITS TO BE OBTAINED BY THE CONTRACTOR <br /> A . The OWNER has obtained certain permits for this project and they are <br /> listed in paragraph SC-6 . 08 of the Supplementary Conditions . Per <br /> paragraph SC-6 . 08 . B of the Supplementary Conditions , the <br /> CONTRACTOR shall apply for, obtain , and pay for all other required <br /> permits and licenses . This may include but not be limited to : <br /> 1 . Long-term or short-term dewatering permit as required by the St . <br /> Johns River Water Management District (SJRWMD ) . Contact <br /> SJRWMD at (321 ) 9844940 to determine which permit is required <br /> and the associated statutory requirements ; and <br /> 2 . The State of Florida Generic Permit for Stormwater Discharge From .. <br /> Large and Small Construction Activities . Contact the Florida <br /> Department of Environmental Protection ( FDEP ) at (866 ) 336-6312 <br /> (toll free ) or (850 ) 245-7522 or .r <br /> www . dep . state .fl . us/water/stormwater/npdes/ <br /> B . Provide copies of all permits to the OWNER and ENGINEER and comply <br /> with all conditions contained in all permits at no extra cost to the OWNER . <br /> If there is a conflict between any permit requirement and these <br /> Specifications , the more stringent specification or requirement shall 4W <br /> govern . <br /> TECHNICIAL PROVISION <br /> TP -3 <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.