Laserfiche WebLink
2. REJECTION OF BIDS <br /> y' The Procurement Official reserves the right to reject any or all bids , in whole or in part, and to waive <br /> any informality in any proposal . Additionally, proposals may be considered irregular and may be <br />.. rejected if the proposal : 1 ) does not strictly conform to the requirements of the bid ; 2) shows <br /> omissions; 3 ) bid form is altered ; 4 ) additions are added which were not called for; 5) is conditional ; <br /> 6 ) the unit prices are, in the opinion of the City, unbalanced either in excess or below the reasonable <br /> cost analysis values; 7) abandonment of the project; and 8 ) bids are over the approved budget for <br /> r <br /> the project. <br /> 3 . BIDDER'S UNDERSTANDING <br /> Bidders shall make all investigation necessary to thoroughly inform themselves regarding the bid , <br /> including visiting the work site to ascertain by inspection pertinent local conditions such as location , <br /> character and accessibility of the site , availability of facilities , location and character of existing work <br /> within or adjacent thereto , labor conditions, etc. The City shall make available to all prospective <br /> Bidders , prior to the receipt of bids, any available information that may be requested by Bidders . <br /> Any such data will be distributed to all prospective bidders as the best factual information available , <br /> without presumption of responsibility for its accuracy or for any conclusions that the bidder may <br /> draw there from . The Bidder shall accept the site or sites in their present condition . <br /> 4. INSPECTION OF FACILITIES <br /> It is the bidder's responsibility to become fully informed as to the nature and extent of the work <br /> required and its relation to any otherwork in the area , including possible interference from other site <br /> activities. Arrangements for bidder's inspection of facilities and/or activity schedules may be <br /> r <br /> secured from the Project Engineer at (XXX) XXX-XXXX. Failure to visually inspect the facilities shall <br /> be cause for rejection of your bid . <br /> 5. LEGAL REQUIREMENTS <br /> Federal , State , County and local laws, ordinances, rules and regulations that in any manner affect <br /> the items covered herein apply. Lack of knowledge by the bidder will in noway be a cause for relief <br /> from responsibility. <br /> ( 1 ) The City's Small Business Ordinance No. 3790-04 is made a part of these documents by <br /> reference hereto . <br /> 50 <br /> Ar OX 9:5429 AM <br />