Laserfiche WebLink
' in Appendix " Be " In the event of a conflict between the referenced Chapter <br /> 4 and these Specifications , the more stringent requirement shall prevail . <br /> 1 . 2 SOME PERMITS TO BE OBTAINED BY THE CONTRACTOR <br /> A . The OWNER has obtained certain permits for this project and they are <br /> listed in paragraph SC-6 . 08 of the Supplementary Conditions . Per <br /> paragraph SC-6 . 08 . 0 of the Supplementary Conditions , the <br /> t CONTRACTOR shall apply for, obtain , and pay for all other required <br /> permits and licenses . This may include but not be limited to : <br /> 1 . Long -term or short-term dewatering permit as required by the St . <br /> ' Johns River Water Management District (SJRWMD ) . Contact <br /> SJRWMD at (321 ) 9844940 to determine which permit is required <br /> and the associated statutory requirements ; <br /> 2 . Florida Department of Environmental Protection ( FDEP ) " Notice of <br /> Intent to Use Generic Permit for Stormwater Discharge From <br /> Construction Activities That Disturb Five or More Acres of Land " <br /> ' permit application form . Contact FDEP at (407 ) 894-7555 or (850 ) <br /> 921 =9904 ; and <br /> 3 . U . S . Environmental Protection Agency ( EPA) " Notice of Intent <br /> ' ( NOI ) for Storm Water Discharges Associated With Construction <br /> Activity Under a NPDES General Permit. " <br /> Be Provide copies of all permits to the OWNER and ENGINEER and comply <br /> with all conditions contained in all permits at no extra cost to the OWNER . <br /> If there is a conflict between any permit requirement and these <br /> Specifications , the more stringent specification or requirement shall <br /> govern . <br /> 1 . 3 GENERAL <br /> A . Do not begin any other construction work until the pollution control and <br /> treatment system has been constructed in accordance with approved <br /> plans and approved for use by the OWNER and applicable permitting <br /> ' authorities . <br /> Be From time to time , the OWNER or ENGINEER will inspect the pollution <br /> ' control and treatment system and may take effluent samples for analysis <br /> by a testing laboratory selected and paid for by the OWNER . If at any <br /> time , the OWNER or ENGINEER determines that the pollution control and <br /> ' treatment system is not in compliance with the approved system , the <br /> OWNER or ENGINEER will shut the portion of the project down that is not <br /> in compliance , and it shall remain shut-down until the pollution control and <br /> treatment system is properly constructed or repaired , and complies with <br /> the approved pollution control and treatment system plans and <br /> specifications . <br /> ' Last revised 3/31 /03 02225-2 EAST GIFFORD <br /> FAPublic WorksVeithmstormwater Projects\Gifford East\Construction Contract\Technical Specifications\Final <br /> ' Specifications\Division 2\02225 - Erosion Control & Treatmentdoc <br />