My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-118A.2
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-118A.2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 4:59:13 PM
Creation date
9/30/2015 6:32:48 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/20/2003
Control Number
2003-118A.2
Agenda Item Number
7.F.
Entity Name
East Gifford Stormwater Improvements
Subject
Volume 2 Specifications and contract documents
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3252
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' b . Manufacturer's literature with product description , performance and test <br /> data , and reference standards . <br /> c . Samples , if appropriate . <br /> d . Name and address of similar projects on which product was used , and <br /> date of installation . <br /> 2 . For construction methods ( if specified ) : <br /> a . Detailed description of proposed method . <br /> b . Drawings illustrating method . <br /> 3 . Such other data as the ENGINEER may require to establish that the proposed <br /> substitution is equal to the product , manufacturer or method specified . <br /> ' C . In making Request for Substitution , CONTRACTOR represents that : <br /> 1 . CONTRACTOR has investigated proposed substitution , and determined that it <br /> is equal to or superior in all respects to the product , manufacturer or method <br /> ' specified . <br /> 2 . CONTRACTOR will provide the same or better guarantees or warranties for <br /> proposed substitution as for product , manufacturer, or method specified . <br /> ' 3 . CONTRACTOR waives all claims for additional costs or extension of time <br /> related to a proposed substitution that subsequently may become apparent . <br /> D . A proposed substitution will not be accepted if: <br /> 1 . Acceptance will require changes in the design concept or a substantial revision <br /> of the Contract Documents , <br /> 2 . It will delay completion of the Work , or the work of other contractors . <br /> 3 . It is indicated or implied on a Shop Drawing and is not accompanied by a <br /> formal Request for Substitution from CONTRACTOR . <br /> E . If the ENGINEER determines that aro osed substitute is not equal to that <br /> P P q <br /> specified , furnish the product , manufacturer, or method specified at no additional <br /> cost to OWNER . <br /> F . Approval of a substitution will not relieve CONTRACTOR from the requirement for <br /> submission of Shop Drawings as set forth in the Contract Documents . <br /> ' + + END OF SECTION + + <br /> Last revised 11 /14/02 01630-2 EAST GIFFORD <br /> FAPublic WorksWeithM\Stormwater Projects\Gifford East\Construction Contract\Technical Specifications\Final Specifications\Division <br /> 1 \01 630 - Substitutions .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.