My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-118A.2
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-118A.2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 4:59:13 PM
Creation date
9/30/2015 6:32:48 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/20/2003
Control Number
2003-118A.2
Agenda Item Number
7.F.
Entity Name
East Gifford Stormwater Improvements
Subject
Volume 2 Specifications and contract documents
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3252
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Postal Service (36 ' to 42 " ) , regardless of the original height. <br /> 9 9 <br /> ' F . Thoroughly clean all materials and equipment and on completion of the work, <br /> deliver the facilities undamaged and in fresh and new-appearing condition . <br /> ' G . It is the intent of the Specifications to place the responsibility on the <br /> CONTRACTOR to restore to their original condition all items disturbed , <br /> destroyed , or damaged during construction . <br /> ' H . When finished surfaces require cleaning with cleaning materials , use only <br /> those cleaning materials which will not create hazards to health or property <br /> and which will not damage the surfaces . Use cleaning materials only on <br /> those surfaces recommended by the manufacturer. Follow the <br /> manufacturer's directions and recommendations at all times . <br /> I . Keep the amount of dust produced during construction activities to a <br /> minimum. At CONTRACTOR' s expense , spray water or other dust control <br /> agents over the areas which are producing the dust. Schedule construction <br /> operations so that dust and other contaminants will not fall on wet or newly- <br /> coated surfaces . <br /> 1 . 3 CLEANUP AND RESTORATION <br /> A . Prior to final completion , the OWNER , ENGINEER and CONTRACTOR shall <br /> review the work area with regards to cleanup and restoration . Clean and/or <br /> restore all items determined to be unsatisfactory by the OWNER or <br /> ENGINEER , at no additional expense . <br /> B . Petroleum or Hazardous Material Spills : If any petroleum product or <br /> hazardous material is spilled on the ground or water surface , immediately <br /> begin cleanup operations and immediately report the spill to the ENGINEER <br /> and the Indian River County Health Department (794-7400 ) . Remove all <br /> contaminated soil and remove all spilled material from canals and other <br /> waterways and dispose of it in an approved manner. All cleanup and <br /> restoration shall be at the CONTRACTOR' s expense . <br /> 1 . 4 PAYMENT <br /> ' A . There shall be no separate payment for any work required by this Section . <br /> All necessary work required or implied herein shall be at the <br /> CONTRACTOR' s expense . <br /> + + END OF SECTION + + <br /> Last revised 7/10/02 01710-2 EAST GIFFORD <br /> FAPublic Works\KeithM\Stormmter Projects\Efford East\Construction Contract\Technical Specifications\Fnal Specifications\Division <br /> ' 1 \01710 - Site Cleanup & Restoration .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.