My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-118A.2
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-118A.2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 4:59:13 PM
Creation date
9/30/2015 6:32:48 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/20/2003
Control Number
2003-118A.2
Agenda Item Number
7.F.
Entity Name
East Gifford Stormwater Improvements
Subject
Volume 2 Specifications and contract documents
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3252
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 3 . 3 CLEANING <br /> 1 A . Upon completion of site demolition work , clean all areas disturbed by the demolition , <br /> including off-site areas , and remove tools and equipment . Leave the construction <br /> site clear, clean , free of demolished materials , and suitable for site work operations . <br /> 3 . 4 SALVAGED MATERIALS <br /> 1A , All materials and equipment removed by the demolition shall become the property of <br /> the CONTRACTOR , except for those marked to become the property of the <br /> 1 OWNER . Carefully remove all materials and equipment marked to be the property <br /> of the OWNER , so as not to damage them , and clean and store them on or <br /> adjacent to the site in a protected place specified by the ENGINEER , or load them <br /> 1 onto trucks provided by the OWNER . Remove demolished materials from the site <br /> as work progresses . Storage and sale of Contractor's salvage items on site is not <br /> permitted . <br /> PART 4 - PAYMENT <br /> 1 A . All demolition work required by this Section for the property west of the stormwater <br /> pond (see sketch on page 02050-3 ) shall be paid under Alternate Bit Item 7 . 03 . All <br /> other demolition work required by this Section shall be paid under Bid Item 2 . 02 , <br /> 1 " Demolitions . " <br /> + + END OF SECTION + + <br /> i <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> Last revised 3/ 10/03 020404 EAST GIFFORD <br /> FAPublic Works\KeithM\Stormweter Projects\Gifford East\Construction Contract\Technical Specifications\Fnal Specifications\Division <br /> 1 2\02040 - Demolitions.doc <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.