Laserfiche WebLink
' SECTION 02050 <br /> ' SITE PREPARATION <br /> PART 1 - GENERAL <br /> 1 . 1 SCOPE <br /> A . This Section covers work along the construction site , including clearing , grubbing , <br /> stripping and disposal , complete as specified herein . <br /> ' 1 . 2 LIMITS OF CLEARING AND GRUBBING <br /> A . Clear and grub only as necessary for the installation of the Work and as indicated <br /> ' on the sketch on page 02050-3 . Unless specifically indicated , do not clear and grub <br /> outside of right-of--way lines or easements . At the stormwater pond site , a strip of <br /> land west of the proposed fence along the western property line is to remain <br /> undisturbed (see page 02050-3 ) , together with all of the land east of the proposed <br /> fence along the eastern property line . <br /> B . Alternate Bid Item 7 . 03 - Selectively clear and grub ( including stumping ) the private <br /> property shown on the sketch on page 02050-3 , leaving an undisturbed 25-foot wide <br /> buffer strip along the east line of said property. Do not remove or disturb any native <br /> trees . Underbrush and remove all exotic vegetation . <br /> C . Apply for and obtain an Indian River County Land Clearing Permit. An application is <br /> provided at the end of this Section . Pay all associated permit application fees . <br /> 1 . 3 CLEARING <br /> ' A . The surface of the round for the area to be cleared and rubbed shall <br /> g g be <br /> completely cleared of all timber, brush , stumps , roots , grass , weeds , structures <br /> designated to be removed , concrete , rubbish and all other objectionable <br /> obstructions resting on or protruding through the surface of the ground . However, <br /> ' all trees shall be preserved unless they are specifically listed in the Contract <br /> Documents to be removed . Conduct clearing operations so as to prevent damage <br /> to trees to be saved , to existing structures and installations , and to those under <br /> ' construction , and so as to provide for the safety of employees and others . Clearing <br /> for structures shall consist of topsoil and vegetation removal . <br /> ' 1 . 4 GRUBBING <br /> ' Last revised 2/ 19/03 02050- 1 EAST <br /> GIFFORD <br /> RIPublic Works\Kemm,stormwater Projects\Gifford East\Construction Contract\Technical Specifications\Final Specifications\Division <br /> ' 2\02050 - Site Preparation .doc <br />