My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-136
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-136
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2016 10:51:23 AM
Creation date
9/30/2015 10:44:00 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
First Amendment
Approved Date
04/17/2007
Control Number
2007-136
Agenda Item Number
7.T.
Entity Name
Great Lakes Dredge and Dock Co.
Subject
Beach Restoration - Sectors 1,2, 7 Ambersand Beach
First Amendment to Agreement
Area
Ambersand Beach
Project Number
0502
Bid Number
2006047
Supplemental fields
SmeadsoftID
6262
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
place material in these areas and compaction equipment will not be used <br /> in these areas. The CONTRACTOR shall be responsible for the <br /> replacement of any damaged or destroyed property or vegetation, to the <br /> satisfaction of the COUNTY . Failure to replace damaged or destroyed <br /> property or vegetation by the CONTRACTOR shall result in replacement <br /> by the COUNTY, and the cost of replacement shall be deducted from <br /> monies due or to become due to the CONTRACTOR. The <br /> CONTRACTOR shall be liable for any non-compliance with the <br /> conditions of the permits, easements and terms of this contract <br /> attributable to their personnel or subcontractors. <br /> 13 . 2 .2 .2 Pollution Prevention. The CONTRACTOR shall continuously monitor <br /> and manage all construction activities to comply with the following <br /> environmental requirements for pollution prevention: <br /> 13 . 2 .2 .2 . 1 Pollution Control Facilities. The CONTRACTOR shall <br /> maintain constructed facilities and portable pollution control <br /> devices for the duration of the contract or for that length of <br /> time construction activities continue. <br /> 13 .2.2 .2.2 Air. The CONTRACTOR shall make all possible efforts to <br /> minimize air pollution. All activities, equipment, processes, <br /> and work operated or performed by the CONTRACTOR in <br /> accomplishing the specified construction shall comply with <br /> the applicable air pollution standards of the State of Florida <br /> (Chapter 403 Florida Statutes and others) and all Federal <br /> emission and performance laws and standards. <br /> 13 .2 .2 .2 .3 Noise. The CONTRACTOR shall make all possible efforts to <br /> minimize noise during fill placement operations. All hauling <br /> and excavating equipment, including dredges and booster <br /> pumps, used on this work shall be equipped with satisfactory <br /> mufflers or other noise abatement devices . The <br /> CONTRACTOR shall conduct these operations so as to <br /> comply with all Federal, State, and local laws pertaining to <br /> noise. The use of horns, whistles, signals, and handling of <br /> dredge pipelines shall be held to the minimum necessary in <br /> order to ensure as quiet an operation as possible while <br /> maintaining safety on the job site. Dredges and booster <br /> pumps used on this Work shall be equipped with satisfactory <br /> mufflers and/or other sound abatement devices to reduce <br /> engine noise. A sound barrier will be constructed landward <br /> of booster pumps in order to reflect noise waterward. The <br /> CONTRACTOR shall conduct his operations so as to comply <br /> with all Federal, State, and local laws pertaining to noise. The <br /> use of horns, whistles, signals, and handling of dredge <br /> TECHNICAL AND ENVIRONMENTAL SPECIFICATIONS TS- 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.