My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-136
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-136
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2016 10:51:23 AM
Creation date
9/30/2015 10:44:00 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
First Amendment
Approved Date
04/17/2007
Control Number
2007-136
Agenda Item Number
7.T.
Entity Name
Great Lakes Dredge and Dock Co.
Subject
Beach Restoration - Sectors 1,2, 7 Ambersand Beach
First Amendment to Agreement
Area
Ambersand Beach
Project Number
0502
Bid Number
2006047
Supplemental fields
SmeadsoftID
6262
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
31 . CONSTRUCTION <br /> 31 . 1 Debris. Prior to placement of fill, the CONTRACTOR shall remove from the beach fill <br /> area of the work all driftwood, rubble, and other debris lying within the foundation limits of <br /> the beach fill section. All materials removed shall be disposed of in an appropriate and <br /> legal manner and at the expense of the CONTRACTOR. Grading and other construction <br /> equipment shall not be permitted outside the construction limits except for ingress to or <br /> egress from the site via the designated mobilization areas. <br /> 31 .2 Lines and Grades. The excavated material shall be placed on the beach to the lines, grades, <br /> and cross-sections indicated in the Plans, unless otherwise directed by the COUNTY. The <br /> fill profile shall be the same as indicated on the Plans. The CONTRACTOR is to place the <br /> fill on the beach in such a manner as to establish a uniform and straight beach between <br /> adjacent pay profile lines. The COUNTY reserves the right to vary the width or grade of <br /> the berm from the lines and grades shown on the Plans or observed at the project site in <br /> order to establish a uniform beach between adjacent pay profile lines or for the entire <br /> length of the project. The beach fill cross-sections shown on the Plans are for the purpose <br /> of estimating the amount of fill needed and shall be used by the COUNTY in making any <br /> change in the lines and grades. <br /> 31 .3 Dikes. Temporary longitudinal dikes and spreader and pocket pipe shall be used as <br /> necessary to prevent gully formation and erosion of the beach and fill, to retain the fill on <br /> the beach within the limits of the fill template cross-section, and to minimize and control <br /> water turbidity. Dikes or mounds shall be constructed along the waterline as necessary <br /> and/or as required by the permits to direct the pipeline discharge longitudinally along the <br /> beach for the purpose of minimizing transverse gully formation from the point of discharge. <br /> The COUNTY may direct the CONTRACTOR to extend dikes, if necessary, to control <br /> turbidity or beach erosion at no additional cost to the COUNTY. The CONTRACTOR <br /> shall not permit wastewater to flow landward of the fill section, or water to form ponds <br /> between the fill and upland areas. The CONTRACTOR shall protect existing drainage <br /> operations . Any material permitted to flow into or restrict the flow of an existing ditch, <br /> canal, or drain pipe, shall be promptly removed. Structures within the fill section shall be <br /> protected by the CONTRACTOR to prevent potential damage by the CONTRACTOR's <br /> operations. <br /> 31 .4 Grading and Dressing. Upon completion of all filling operations within an acceptance <br /> section, the fill shall be graded and dressed so as to eliminate any undrained pockets, <br /> ridges, and depressions in the beach fill surfaces and as necessary to further comply with <br /> Sections 31 . 16 of these Technical Specifications. As a condition of acceptance, the <br /> CONTRACTOR is to grade and dress the fill on the beach in such a manner as to establish <br /> a uniform berm width and slope between adjacent pay profile lines <br /> The CONTRACTOR shall not be <br /> required to dress the fill below mean high water to the slope shown. <br /> TECHNICAL AND ENVIRONMENTAL SPECIFICATIONS _ TS-29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.