My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-283B
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-283B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2016 2:08:23 PM
Creation date
10/1/2015 1:19:29 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Lease
Approved Date
11/03/2009
Control Number
2009-283B
Agenda Item Number
8.Q.
Entity Name
Florida Inland Navigation District
Subject
Lease Agreement
Supplemental fields
SmeadsoftID
8586
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
( Section 2 . 3 . 6) will produce an additional 7,200 cy of material . Should some material excavated from the <br /> basin interior be unsuitable for dike construction, the ditch material can make up the deficit. Alternatively, <br /> the material excavated from the ditch can contribute to the dike requirement to reduce the excavation depth <br /> in the basin interior. The final excavation depth and distribution of material , determined in the final design <br /> phase, will reflect the results of detailed subsurface investigation. <br /> The interior of the containment basin must also be graded following excavation . Construction <br /> efficiency may initially dictate taking dike material from a perimeter trench inside the containment dike. <br /> However, before dredging operations begin, this trench must be eliminated and the site interior regraded to <br /> avoid flow channelization and unacceptable effluent quality. if left ungraded , the irregular topography within <br /> the basin will produce nonuniform flow and deposition patterns which , in turn, will result in isolated surface <br /> water ponding. Ponding will inhibit drying of the deposition layer and make initial attempts at surface <br /> trenching more difficult . For these reasons, a uniform grade with an adequate slope (about 0 . 2%) must be <br /> provided from inlet to weir as part of initial facility construction . Thus, although the basin interior will <br /> maintain a mean excavated grade of 44 ft NGVD, the floor of the basin will slope uniformly downward <br /> from approximately +0 .4 ft NGVD near the inlet to approximately - 1 . 2 ft NGVD at the weir. Once dredging <br /> operations begin , differential settling of varying grain size fractions ( i . e . , rapid precipitation of the coarser <br /> fractions nearerthe inlet with increasingly finer sediments deposited nearerthe outlet) will maintain a rough <br /> downward slope from inlet to weir. <br /> 2.3 Additional Design Features <br /> 2. 3. 1 Inlet <br /> The number and locations of the dredge slurry outfalls, or pipeline inlets, govern the pattern of <br /> deposition within the containment basin . A single, moveable inlet offers several advantages over single or <br /> multiple fixed designs . A single, fixed inlet would produce a mound of coarse material at the fixed inlet <br /> point. If not mechanically redistributed, the mound would effectively reduce the basin ponding area . A <br /> multiple inlet manifold could overcome this disadvantage . However, the infrequent maintenance projected <br /> for this portion of the ICWW, once every 5 to 10 years, cannot justify the cost of a fixed , multiple inlet <br /> manifold system for the IR- 14 containment basin . More cost effective, a single inlet, periodically <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.