My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-183
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-183
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2016 9:55:32 AM
Creation date
10/1/2015 3:40:36 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
06/23/2009
Control Number
2009-183
Agenda Item Number
8.H.
Entity Name
FPL Energy Services Inc.
Subject
Change Order No.1 Phase 1 HVAC Improvements
Revised Energy Savings Guarantee
Area
North County Library
Supplemental fields
SmeadsoftID
10718
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M &V option How savings are Typical Applications <br /> calculated <br /> B . Retrofit Isolation Engineering Application of controls to <br /> calculations using short vary the load on a <br /> Savings are determined by field term or continuous constant speed pump <br /> measurement of the energy use of the measurements . using a variable speed <br /> systems to which the ECM was applied , drive . Electricity use is <br /> separate from the energy use of the rest of measured by a kWh <br /> the facility . Short-term or continuous meter installed on the <br /> measurements are taken throughout the electrical supply to the <br /> post- retrofit period . pump motor . In the base <br /> year this meter is in <br /> place for a usually week <br /> to verify constant <br /> loading . The meter is in <br /> place periodically <br /> throughout the post- <br /> retrofit period to track <br /> variations in energy use . <br /> C . Whole Facility Analysis of whole facility Multifaceted energy <br /> utility meter or sub- management program <br /> Savings are determined by measuring energy meter data using affecting many systems <br /> use at the whole facility level . Short-term or techniques from simple in a building . Energy use <br /> continuous measurements are taken billing comparison to is measured by the gas <br /> throughout the post- retrofit period . regression analysis and electric utility meters <br /> for a twelve month base <br /> year period and <br /> throughout the post. <br /> retrofit period , <br /> D . Calibrated Simulation Energy use simulation , Multifaceted energy <br /> calibrated with hourly management program <br /> Savings are determined through simulation of utility billing data and/or affecting many systems <br /> the energy use of components or the whole end - use metering in a building where no <br /> facility Simulation routines must be base year data are <br /> demonstrated to adequately model actual available . Post- retrofit <br /> energy performance measured in the whole period energy use is <br /> facility . This option usually requires measured by the gas <br /> considerable skill in calibrated simulation , and electric utility meters <br /> or sub- metering . Base <br /> year energy use is <br /> determined by simulation <br /> using a model calibrated <br /> by use of sub - metering . <br /> Indian River County , Florida 18 Indian River County Phase 1 <br /> Phase I Rev 06/09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.