My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-187
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-187
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2016 1:43:48 PM
Creation date
9/30/2015 8:48:51 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Migration
Approved Date
05/24/2005
Control Number
2005-187
Agenda Item Number
14.B.3
Entity Name
GeoSyntec Consultants
Subject
Proposal Groundwater monitoring; Work Order No.1
Work Authorization No.01
Area
South Gifford Road Landfill
Supplemental fields
SmeadsoftID
4966
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r . <br /> l 'YEOSYNTEC CONSULTANTS <br /> Mr. Tanhum Goldshmid <br /> Indian River County, Solid Waste Disposal District <br /> 3 May 2005 <br /> Page 3 <br /> • confirm that the CVOC plume is not migrating by monitoring the lateral and vertical <br /> extent (which requires the installation of additional proposed monitoring wells since <br /> the CVOC plume is currently not delineated) ; <br /> • evaluate the impact of source remediation and P&T operations to assess C VOC plume <br /> centerline concentrations over time ; and <br /> • assess the impact of biological and physical natural attenuation processe 15 on CVOC <br /> plume degradation . <br /> OVERVIEW OF P&T SYSTEM REPORTING <br /> As part of the reporting requirements presented in the RAP , quarterly II&T system <br /> letter reports are required to document the following : <br /> • groundwater volumes processed by the air stripper during the reporting period ; <br /> • effectiveness of the air stripper in removing CVOCs ; <br /> • operation and maintenance (O&M) activities performed during the repor .ing period; <br /> and <br /> • any repairs or operational problems . <br /> Presently, all P&T system-related O&M activities and system sampling are performed <br /> by IRC personnel . It has been assumed for costing purposes herein that IRC ill continue <br /> to perform these activities . <br /> PROPOSED SCOPE OF WORK <br /> GeoSyntec developed a phased approach with internal task elements to accomplish <br /> this work in an organized and cost-effective manner. The remainder of this let er provides <br /> a description of the proposed scope of work and a budget estimate to accompli h the work <br /> described herein. <br /> XR05010 IRC MPIS-PM Sampling\R050001J-rev.doc <br /> e, RECYCLED AND RECYCLABLE � r <br />
The URL can be used to link to this page
Your browser does not support the video tag.