Laserfiche WebLink
a <br /> EOSYNTEC CONSULTANTS <br /> Mr. Tanhum Goldshmid <br /> Indian River County, Solid Waste Disposal District <br /> 3 May 2005 <br /> Page 7 <br /> and turbidity, will be monitored by a GeoSyntec representative during t iis process . <br /> Extracted groundwater during the redevelopment process will be collected 4and pumped <br /> through the on- site air stripper for treatment . <br /> Task 2. 4 Groundwater Sampling <br /> GeoSyntec will perform the groundwater sampling activities associated with the MPIS <br /> network and the CVOC plume monitoring wells . Groundwater sampling activities will be <br /> executed using a two-person sampling crew. Groundwater sampling will be performed in <br /> accordance with the FDEP SOPS . Consistent field documentation and field p otocols will <br /> be utilized to develop reliable data to support the exit strategy and/or natural attenuation <br /> approach for the project . <br /> Task 2. 5 Water Level Measurements <br /> Under Subtask 2 . 5 , GeoSyntec will conduct a complete round of groundwater level <br /> measurements coincident with each semi-annual groundwater sampling event . Depth to <br /> groundwater measurements will be recorded to the nearest 0 . 01 -ft in the MPIS and CVOC <br /> plume monitoring network wells , a total of 100 monitoring wells (82 existing monitoring <br /> wells, three pumping wells, ten infiltration gallery wells, and five proposed monitoring <br /> wells) . <br /> Task 3 — Data Evaluation <br /> Under Task 3 , GeoSyntec will perform data evaluation activities for the MPIS and <br /> CVOC plume monitoring reporting. These activities will include database rr, anagement, <br /> data evaluation and screening, and geographical information systems (GIS) figure <br /> preparation. <br /> Task 4 — MPIS Reporting <br /> The results of groundwater sampling under the MPIS will be presented in a report <br /> supported by attachments containing Chain of Custody sheets, field notes and observations, <br /> water sampling logs , maps, analytical results, and any other applicable mateir als . These <br /> reports will be prepared under Task 4 and will be submitted to IRC for revi w prior to <br /> submittal to FDEP . According to the MPIS , monitoring test results must be submitted to <br /> XR05010 IRC MPIS-PM Sampling\R050001J-rev.doc <br /> q, RECYCLED AND RECYCLABLE r <br />