My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-123
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-123
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2016 12:16:32 PM
Creation date
10/1/2015 3:32:02 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/05/2009
Control Number
2009-123
Agenda Item Number
8.O.
Entity Name
Geosyntec Inc.
Subject
Work Order No.21 Underground Fuel Tanks
Area
Sheriff's Administration Building
Supplemental fields
SmeadsoftID
10617
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> I <br /> Mr. Lynn Williams <br /> 16 April 2 (709 C� UWSYC Lee 1 <br /> Page 4 Cons111tarits <br /> square feet proposed , etc . Geosyntec will notify IRC and secure approval of any field conditions <br /> that may require access to contingency fees . Geosyntec ' s proposal assumes up to six days of <br /> oversight for field activities associated with the UST closure and AST connection activities . A <br /> breakdown of estimated project costs is included as Attachment 3 . <br /> Phase C — Reporting <br /> GeoSyntec will prepare a Tank Closure Report in accordance with Chapter 62 - 761 , FAC and <br /> FDEP Storage Tank System Closure Requirements . The report will include photographs <br /> documenting the tank closure work , laboratory analytical results for collected soil and <br /> groundwater samples in tables and figures , and a detailed summary of the field activities <br /> completed at the site . The final reports ( four hard copies and one electronic copy to be provided <br /> to IRC ) will be signed and sealed by the Florida - licensed professional engineer in responsible <br /> charge of the project . A breakdown of estimated project costs is included as Attachment 3 . <br /> ASSUMPTIONS <br /> The following assumptions were made in developing this fee proposal : <br /> • IRC personnel will assist Geosyntec with the identification of and protection (if <br /> necessary) of any utilities located within the UST excavation area . <br /> • Geosyntec will not be responsible for damage to any underground utilities located on the <br /> site ( it is presumed that any utilities encountered during UST closure activities will be <br /> cut/ capped and/or removed for off-site disposal ) . <br /> • No costs are provided for the removal of the overhead canopy. <br /> • The USTs will be drained of fuel ( to the greatest extent feasible) prior to UST closure <br /> field activities . <br /> • The USTs , product piping, concrete , and miscellaneous debris will be transported to the <br /> IRC Class I landfill for disposal as non - hazardous waste . Landfill disposal charges will <br /> be handled directly by IRC . <br /> • All site work can be performed in Level D personal protective equipment . <br /> X 8091 i 6„'CC RO9040 . D0C <br /> C11 " ilicers itiliovalmIs <br />
The URL can be used to link to this page
Your browser does not support the video tag.