Laserfiche WebLink
W <br />4.2 Backfill — Only good quality backfill, free of stones, roots, rocks, broken cement, <br />or other material which might be damaging to the pipe shall be used. Backfill shall <br />be placed in the trench in uniform lifts of 12 inches. <br />` 4.3 Compaction —All fill must be compacted by hand tamping from under the pipe <br />up to the centerline. Backfill shall be compacted in lifts up to the surface to achieve <br />a minimum compaction of 95% of maximum density in roadways and shoulders and <br />` 90% in easements, in accordance with AASATO T-180 and D-2167. <br />4.4 Dewatering — Construction shall be accomplished in a dry trench. Wellpointing <br />will be required as necessary. All water entering excavations or other parts of the <br />work shall contained, collected, and pumped to suitable places for disposal, as <br />permitted by State. <br />r <br />4.5 Sheetino — Sheeting and shoring shall be installed as may be necessary for the <br />protection of the work, preservation of adjacent property and structures, and the <br />safety of employees. Sheeting and bracing shall be uniform to OSHA requirements. <br />5. Installation of water mains must be in accordance with AWWA Standard C600, <br />irrespective of the type of pipe selected. All installation procedures must also be in <br />conformance with pipe manufacturer's recommendations. Minimum cover shall be 3.6 <br />inches. Magnetic I.D. Tape shall be placed continuously in the trench over PVC pipe, <br />12" below grade. Allowable deflection of the pipe joints and curvature of PVC pipe shall <br />` not exceed the manufacturer's specifications. <br />5.1. Trench: Trench width shall be kept to a minimum necessary for pipe <br />• installation. The trench bottom shall be graded, and alignment shall be parallel with <br />the roadway, where possible. <br />• 5.2. Backfill: Only good quality backfill, free of stones, roots, rocks, broken cement, <br />or other material which might be damaging to the pipe shall be used. Backfill must <br />be put in the trench in lifts. <br />• <br />5.3. Compaction_ All pipe must be compacted by hand tamping to the centerline, <br />under the pipe. Backfill shall be compacted in lifts up to the surface to achieve a <br />• minimum compaction of 95% of maximum density in roadways, and shoulders, and <br />90% in easements in accordance with AASHTO T-180 and ASTMD-2167. <br />5.4. Dewatering: Construction shall be accomplished in a dry trench. Welipointing <br />` will be required, as necessary. All water entering excavations or other parts of the <br />work shall be contained, collected, and pumped to suitable places for disposal as <br />_ permitted by State. <br />5.5. Sheeting: Sheeting and shoring shall be installed as may be necessary for the <br />protection of the work, preservation of adjacent property and structures, and the <br />+� safety of employees. Sheeting and bracing shall be uniform to OSHA requirements. <br />• <br />• <br />