My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-009 (4)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-009 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 10:18:25 AM
Creation date
9/30/2015 11:53:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/08/2008
Control Number
2008-009 (4)
Agenda Item Number
11.I.1
Entity Name
H & J Contracting
Subject
CR 512 Phase IV Improvements
Area
CR 512
Project Number
9611
Bid Number
2008012
Supplemental fields
SmeadsoftID
6831
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> 3 . Fittings <br /> a . All underground fittings shall be either bell and spigot, or mechanical joint. <br /> r Mechanical joints shall conform to AWWA Specification C110 (ANSI 21 . 10-87), or <br /> latest revision . All aboveground fittings shall be flanged joint. <br /> b . The pressure rating shall be 250 psi for fittings up to 12" and a minimum of 150 psi for <br /> larger sizes. <br /> r c. All fittings shall be lined with the same material as specified for the pipe as discussed <br /> in the lining and coating section. <br /> r 4. Lining and Coating <br /> a. Unless otherwise indicated, all ductile iron pipe shall be factory lined and coated . <br /> i <br /> b. Lining : All pipe shall be cement mortar lined and seal coated in accordance with <br /> AWWA Standard C104 (ANSI A21 .4-85) , or latest revision. <br /> r c . Coating : pe Unless specified otherwise, all <br /> pipe shall be bituminous coated outside to a <br /> dry film thickness of at least 1 mil. <br /> d. Repair. Anywhere that the coating is removed purposely or accidentally, the area <br /> shall be cleaned of any rust, grease, and recoated to a minimum dry film as specified <br /> for the individual piece. <br /> r <br /> e. Encasement: If and where directed by IRCDUS , a polyethylene encasement shall be <br /> provided over pipe, fittings, and valves. The material, installation, and workmanship <br /> r shall conform to applicable sections of AWWA C105 (ANSI A21 .5-88), or latest <br /> revision. Installation methods A or B shall be employed using flat tube polyethylene . <br /> The Contractor shall make provisions to keep the polyethylene from direct exposure <br /> r to sunlight prior to installation, and backfilling following installation shall be completed <br /> without delay to avoid exposure to sunlight. <br /> r 5 . Bell and Spigot Connections <br /> Joints in bell and spigot pipe shall be push-on, mechanical, or restrained joints in <br /> accordance with AWWA Standard C-111 (ANSI 21 . 11 -85), or latest revision. <br /> Mechanical joint pipe set screw type retainer glands will be permitted on a case-by-case <br /> basis, when restrained mechanical joints, in accordance with AWWA Standard 0-111 <br /> (ANSI 21 . 11 -85), or latest revision, are Impractical. Thrust blocks may be required by <br /> • IRCDUS in cases where retainer glands are used. <br /> 6. Flanged Connections <br /> a. All flanged pipe barrels shall comply with the physical and chemical requirements as <br /> set forth in the Handbook of Ductile Iron Pipe of the Cast Iron Pipe Research <br /> r Association. Flanges shall be in accordance with ANSI Specification B16.1 for Class <br /> 125 flanges. Bolts shall comply with ANSI Specification 818.2. <br /> i <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.