My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-098
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2026 11:59:23 AM
Creation date
10/1/2015 12:03:02 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
04/08/2008
Control Number
2008-098
Agenda Item Number
8.L.
Entity Name
Kimley-Horn and Associates
Subject
Amendment No.4 services agreement 66th Ave. Roadway Widening
Area
66th Avenue /CR 510
Supplemental fields
SmeadsoftID
6945
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County, Amendment No. 4 <br />60 Avenue/ County Road 510 Roadway Widening <br />The ENGINEER shall analyze and evaluate each corridor alternate to a point of <br />rejection or selection as a viable corridor. The impacts for each alternate shall be <br />identified and expressed in a form suitable for comparison to other corridor <br />alternates. It will be necessary to analyze in sufficient detail to identify enough <br />differences to select the most viable corridor(s) that would be in the best overall <br />public interest. The analysis will include evaluation of alternative alignments, <br />safety considerations, long range planning, environmental impacts and costs. <br />The ENGINEER shall prepare a Route Study to document the results of the <br />corridor analysis. The Route Study shall summarize the project need, discuss the <br />corridors evaluated, and provide a recommendation for the best corridor(s) for <br />further study. <br />D. Roadway Plans <br />Roadway plans shall be prepared to include: plotting of survey data; <br />establishment of profile grades; key map; plan and profile sheets (including <br />geometric calculations); typical section sheets; summary of quantities; summary <br />of drainage structures; cross-section sheets at 100' intervals (including earthwork <br />computations); signing and pavement marking plans; and other detail sheets <br />necessary to convey the intent of the scope of services outlined herein. All plans <br />shall be prepared in the English units. <br />Roadway set of plans shall consist of the following: <br />The Roadway plans will be submitted to the COUNTY for review at the 30%5 <br />60%, 90% and 100% plan completion. <br />The scope of this work will require coordination with adjacent on-going <br />COUNTY projects at the south project termination point. Due to the construction <br />Page 4 of 8 <br />30% <br />60% <br />90% <br />100% <br />Cover Sheet <br />X <br />X <br />X <br />X <br />Typical Sections <br />X <br />X <br />X <br />X <br />Summary of Quantities & General Notes <br />X <br />X <br />Summary of Drainage Structures Sheets <br />X <br />X <br />X <br />Plan and Profile Sheets <br />X <br />X <br />X <br />X <br />Construction Details <br />X <br />X <br />Cross Sections at 100 ft interval <br />X <br />X <br />X <br />Signage & Pavement Marking Plans <br />X <br />X <br />X <br />X <br />Signalization Plans <br />X <br />X <br />X <br />Intersection Plan & Details <br />X <br />X <br />X <br />X <br />Stormwater Pollution Prevention Plans SWPPP <br />X <br />X <br />Computation Book <br />X <br />X <br />Construction Cost Estimate and Quantities <br />X <br />X <br />X <br />X <br />The Roadway plans will be submitted to the COUNTY for review at the 30%5 <br />60%, 90% and 100% plan completion. <br />The scope of this work will require coordination with adjacent on-going <br />COUNTY projects at the south project termination point. Due to the construction <br />Page 4 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.