My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-276 A
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-276 A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 10:13:27 AM
Creation date
10/1/2015 12:33:44 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/09/2008
Control Number
2008-276A
Agenda Item Number
8.DD.
Entity Name
Interstate Engineering Corp.
Subject
South RO Water Treatment Improvements Conditions of Contract
Area
South RO Water Treatment Plant
Project Number
UCP 2859
Bid Number
2008027
Supplemental fields
SmeadsoftID
7555
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A . Per specification 00100, Paragraph 1 . 21 ; Indian River County will pay <br /> the permit fee. <br /> 9 . Q . Is Control Systems Design (CSD) working for the Owner or the <br /> Engineer? <br /> A. Control Systems Design is working directly for the Contractor. <br /> IV . Site Visit <br /> 1 . Q . Can the existing overhead crane system be used? <br /> A. The existing overhead crane system may be utilized; however, the Owner <br /> makes no guarantee to the Contractor that system will be functioning at <br /> the time of construction. <br /> V . Written Questions <br /> The following written questions were received : <br /> 1 . Q. Item 4 and 5 on sheet M-2 are they the same? <br /> A. They will be the same for Trains 1 and 2 . <br /> 2 . Q . Do you want the membranes we take out of the old vessels reinstalled <br /> in the new vessel? <br /> A . Yes. <br /> 3 . Q . Are there any back-up membranes in case any of the membranes are <br /> damaged during the removal process? <br /> A . There are no spare or back-up membranes. The Contractor is <br /> responsible to replace any membrane (s) that is damaged during <br /> construction. <br /> 4 . Q . Is there an alternate place provided to dump permeate water during <br /> bacteriological testing? <br /> A . The Contractor shall furnish all necessary piping, valves and <br /> appurtenances to construct a temporary means to discharge the <br /> permeate through the west overhead door of the RO process room. <br /> 5 . Q . Sheet M-2 states supply and install new 64nch permeate header with <br /> saddle adapters . Could we substitute with tees or tap the pipe and <br /> PVC weld? <br /> A . Solvent welded tees are acceptable. Tapping and welding is not <br /> acceptable. <br /> 6 . Q . Section 00100-4 Article 1 . 10 item F requires bidders to submit a <br /> Schedule of Subcontractors, Section 00431 , with the bid. <br /> A. Section 00431 , Schedule of Subcontractors, will be included in <br /> Addendum No. 2. <br /> C Documents and Set ings\â–ºnikehU ocal Settingffemp\ADDENDUM NO. l .doc <br /> . 3 . <br />
The URL can be used to link to this page
Your browser does not support the video tag.