Laserfiche WebLink
Work. Contractor shall not be required to employ any Subcontractor, Supplier or other person or <br />organization against whom Contractor has reasonable objection. <br />SC -6.0613 Delete Paragraph 6.06B of the General Conditions in its entirety. <br />SC -6.08 Delete Paragraph 6.08 of the General Conditions in its entirety and replace with the following: <br />ALL PERMIT, IMPACT, OR INSPECTION FEES APPLICABLE AT THE TIME OF OPENING OF BIDS <br />THAT ARE PAYABLE TO INDIAN RIVER COUNTY IN CONNECTION WITH THE WORK ON THIS <br />COUNTY PROJECT WILL BE PAID BY INDIAN RIVER COUNTY. Contractor acknowledges that the <br />foregoing items are governed by the provisions of Florida Statutes section 218.80, Public Bid Disclosure Act. <br />Further, Contractor shall pay the applicable business tax and obtain a business tax receipt from the Indian <br />River County Tax Collector. Unless otherwise provided in the Contract Documents, Contractor shall obtain <br />and pay for all applicable construction permits. Owner shall reimburse Contractor for the cost of such permits <br />on the basis of actual cost. Owner shall assist Contractor, when necessary, in obtaining such permits and <br />licenses. As set forth in the Contract Documents, re -inspection fees are payable solely by Contractor. Owner <br />shall pay all charges of utility owners for connections for providing permanent services to the Work. Owner <br />has obtained the [insert permit types here, both outside regulatory and Indian River County] from [insert permit <br />types here, both outside regulatory and Indian River County] and such permits are included in the Contract <br />Documents in Section [insert section #]. Owner has obtained/made application for the[insert permit types here, <br />both outside regulatory and Indian River County Florida Department of Transportation right-of-way permit, the <br />NPDES permit, and the dewatering permit, if required.] Any permits issued after issuance of bid documents <br />will be provided as an Addendum. Contractor acknowledges that the foregoing items are governed by the <br />provisions of Florida Statutes section 218.80 (2007), Public Bid Disclosure Act. <br />SC 6.11 A.3: Delete the words: "arbitration or" in line 9 of paragraph 6.11 A.3 of the General Conditions. <br />SC 6.19A: Delete Paragraph 6.19A. of the General Conditions in its entirety and replace with the <br />following: <br />A. Contractor warrants and guarantees to Owner for one 1) year from the date of Final Completion that <br />all Work will be in accordance with the Contract Documents and will not be defective; provided, however, <br />that manufacturer equipment warranties may be of a longer duration. <br />SC -6.20A <br />Delete paragraph 6.20A of the General Conditions in its entirety. <br />SC -6.21E <br />Delete paragraph 6.21 E of the General Conditions in its entirety and replace with the following: <br />E. Contractor shall not be responsible for the adequacy of the performance criteria or design criteria <br />required by or contained in the Contract Documents. <br />ARTICLE 7 OTHER WORK AT THE SITE <br />SC-7.0IA. Delete paragraph 7.01A of the General Conditions in its entirety and replace with the <br />following: <br />044572017 <br />00800-9 <br />