My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-276 D
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-276 D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 10:29:43 AM
Creation date
10/1/2015 12:34:52 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/09/2008
Control Number
2008-276 D
Agenda Item Number
8.DD.
Entity Name
Interstate Engineering Corp.
Subject
South RO Water Treatment Plant Improvements Material and Equipment
Area
South RO Water Treatment Plant
Project Number
UCP 2859
Bid Number
2008027
Supplemental fields
SmeadsoftID
7558
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 . Stainless steel screens over all air openings . <br /> 3 . Stainless steel nameplate. <br /> 4 . Motor must be premium efficiency as determined by NEMA test mg 1 - 12 . 53d <br /> (IEEE- 112 test Method B) . <br /> 5 . The terminal housing for the motor is to be substantial fabricated steel or cast <br /> ferrous construction, and be rotatable in 90 degree steps , or suitable to receive a <br /> conduit from above, below or either side . The terminal housing is to be gasketed <br /> between frame and box. Grounding provisions must be made inside the terminal <br /> box by means of clamp type wire terminal . <br /> 6 . The heater leads must be clearly identified with permanent tags . <br /> 7 . Commercial test must be made on motor provided, including no-load current at <br /> rated voltage, high potential , and locked rotor current . <br /> 2 . 11 COATINGS <br /> A. The pump and motor shall be coated in accordance with Section 09900 , and all paint in <br /> contact with potable water must be NSF approved. <br /> PART 3 - EXECUTION <br /> 3 .01 GENERAL <br /> A. The pump and its components shall be complete with a manufacturer's warranty for defects in <br /> materials and workmanship for a period of one year from the time the pump is placed into <br /> operation . <br /> 3 .02 PRODUCT HANDLING <br /> A. All parts shall be properly protected so that no damage or deterioration will occur during a <br /> prolonged delay from the time of shipment until installation is completed and the units and <br /> equipment are ready for operation. <br /> 3 .03 PERFORMANCE <br /> A. The manufacturer shall warrant that the performance of all pumps shall conform with <br /> manufacturer' s certified pump performance curves. The pumps must operate within the <br /> tolerances of the Standards of the Hydraulic Institute. Curves published for similar pumps by !. <br /> another manufacturer will not be acceptable for this purpose. <br /> I <br /> I <br /> 044572017 <br /> 11934-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.