My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-276 D
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-276 D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 10:29:43 AM
Creation date
10/1/2015 12:34:52 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/09/2008
Control Number
2008-276 D
Agenda Item Number
8.DD.
Entity Name
Interstate Engineering Corp.
Subject
South RO Water Treatment Plant Improvements Material and Equipment
Area
South RO Water Treatment Plant
Project Number
UCP 2859
Bid Number
2008027
Supplemental fields
SmeadsoftID
7558
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 .04 SHOP PAINTING <br /> A. Before exposure to weather and prior to shop painting, all surfaces shall be thoroughly <br /> cleaned, dry and free from all mill -scale, rust, grease, dirt and other foreign matter. <br /> B . All pumps and motors shall be shop primed with primer compatible with field painting as <br /> specified in Division 9 . <br /> C . All nameplates shall be properly protected during painting. <br /> D . Gears , bearing surfaces , and other similar surfaces obviously not to be painted shall be given <br /> a heavy shop coat of grease or other suitable rust resistant coating. This coating shall be <br /> maintained as necessary to prevent corrosion during periods of storage and erection and shall <br /> be satisfactory to the Engineer up to the time of the final acceptance test <br /> 3 .05 INSTALLATION <br /> A. Install all equipment in strict conformance with the manufacturer ' s specifications and <br /> industry standards . Perform all work in a workmanlike manner. <br /> B . Manufacturer ' s representative for pumps shall inspect installation for correctness and <br /> compliance with manufacturer' s specifications and submit written certification that <br /> equipment is ready to be placed in service. <br /> C . No piping connecting any of the equipment shall be jacked, pried or forced in to position in <br /> any way. All piping must mate perfectly with the equipment it is attaching prior to <br /> installation of flange bolts or other connecting devices. <br /> D . Prepare existing concrete pedestal as needed for installation of proposed pumping units. <br /> E . No more than one high service pump can be out of service at any time . No high service <br /> pump can be out of service for any longer than 10 days during the replacement/start-up <br /> process. <br /> F . The contractor shall coordinate with Hudson Pump so that the pump rehabilitation of the <br /> shelf spare can be performed onsite once one of the existing high service pumps has been <br /> removed from service . Contact Jim Walton with Hudson Pump at 863 -66547867 to <br /> coordinate costs and scheduling of work. Rehabilitation of the one ( 1 ) high service pump <br /> must be coordinated with the Owner as to not interrupt water plant operations. The contractor <br /> shall be responsible to store the shelf spare pump as directed by the Owner. <br /> G. Each high service pump must be installed, tested, disinfected, and fully operational before <br /> removing the next high service pump. <br /> 3 .06 START-UP <br /> A. The pump manufacturer shall have a qualified representative mate the pump to the motor. <br /> Manufacturer must provide a qualified representative on-site for a minimum of one day to <br /> certify the pump installation and confirm pump performance. <br /> 044572017 <br /> 11934-9 <br />