Laserfiche WebLink
B. Megger each motor winding before energizing the motor, and, if insulation resistance is <br />found to be low, shall notify the Engineer and shall not energize the motor. <br />C. Check all motors for correct clearances and alignment and for correct lubrication in <br />accordance with Manufacturer's instructions. The Contractor shall check direction of rotation <br />of all motors and reverse connections if necessary. <br />D. The Contractor shall meet all the requirements of Division 16. <br />E. After initial start-up under the supervision of a qualified representative of the pump <br />manufacturer, a preliminary running -in period shall be provided for the Contractor to make field <br />tests and necessary adjustments. The pumps will then operate for a period concurrent with the <br />plant acceptance test. <br />F. Field test pumps for conformance to specified operating conditions. Record initial flow, <br />head, voltage and amperage for each power leg. Adjust tolerances, if necessary and retest. <br />Confirm that the amplitude and frequency of vibration during pump operation is within the <br />tolerances of the Standards of the Hydraulic Institute. Measure noise (dBA) adjacent to <br />pump, and at 10 feet and 50 feet away. <br />G. At the end of the specified period of operation, the pumps shall be accepted if, in the opinion of <br />the Engineer/Owner, the pumps have operated satisfactorily without excessive power input, <br />wear, lubrication, or undue attention required for this operation, and if all rotating parts operate <br />without excessive vibration or noise at any operating head. <br />H. Pump and piping installed shall be disinfected in accordance with AWWA standards, and <br />Section 02670 Pressure Testing and Disinfection prior to being placed in service. <br />3.07 OPERATIONS AND MAINTENANCE TRAINING <br />A. The Contractor shall provide the services of qualified factory service representatives to <br />instruct the Owner's personnel in the operation and maintenance of the pump and motor <br />units, including step-by-step troubleshooting with necessary test equipment. Instruction shall <br />be specific to the model of equipment furnished. This service shall consist of a one -day visit <br />for each type of similar pump and motor. <br />B. The technical representative shall have at least two year's of experience in pump equipment <br />training and instruction. Training sessions shall be scheduled not less than two weeks in <br />advance. Training materials shall be provided to each of the Owner's personnel in attendance <br />and shall remain with the trainees. <br />Co All costs for transportation, lodging, subsistence, and other incidental costs for the <br />manufacturer's representative during the installation, testing, and instruction shall be borne <br />by the Contractor at no cost to the Owner. <br />END OF SECTION <br />044572017 <br />11934-10 <br />