Laserfiche WebLink
B . Megger each motor winding before energizing the motor, and, if insulation resistance is <br /> found to be low, shall notify the Engineer and shall not energize the motor. <br /> C . Check all motors for correct clearances and alignment and for correct lubrication in <br /> accordance with Manufacturer's instructions . The Contractor shall check direction of rotation <br /> of all motors and reverse connections if necessary . <br /> D . The Contractor shall meet all the requirements of Division 16 . <br /> E . After initial start-up under the supervision of a qualified representative of the pump <br /> manufacturer, a preliminary running-in period shall be provided for the Contractor to make field <br /> tests and necessary adjustments . The pumps will then operate for a period concurrent with the <br /> plant acceptance test. <br /> F . Field test pumps for conformance to specified operating conditions . Record initial flow, <br /> head, voltage and amperage for each power leg . Adjust tolerances, if necessary and retest . <br /> Confirm that the amplitude and frequency of vibration during pump operation is within the <br /> tolerances of the Standards of the Hydraulic Institute. Measure noise (dBA) adjacent to <br /> pump , and at 10 feet and 50 feet away . <br /> G . At the end of the specified period of operation, the pumps shall be accepted if, in the opinion of <br /> the Engineer/Owner, the pumps have operated satisfactorily without excessive power input, <br /> wear, lubrication, or undue attention required for this operation, and if all rotating parts operate <br /> without excessive vibration or noise at any operating head. <br /> H. Pump and piping installed shall be disinfected in accordance with AWWA standards, and <br /> Section 02670 Pressure Testing and Disinfection prior to being placed in service. <br /> 3 .07 OPERATIONS AND MAINTENANCE TRAINING <br /> A. The Contractor shall provide the services of qualified factory service representatives to <br /> instruct the Owner's personnel in the operation and maintenance of the pump and motor <br /> units, including step-by-step troubleshooting with necessary test equipment. Instruction shall <br /> be specific to the model of equipment furnished. This service shall consist of a one day visit <br /> for each type of similar pump and motor. <br /> B . The technical representative shall have at least two year's of experience in pump equipment <br /> training and instruction. Training sessions shall be scheduled not less than two weeks in <br /> advance. Training materials shall be provided to each of the Owner's personnel in attendance <br /> and shall remain with the trainees. <br /> Co All costs for transportation, lodging, subsistence, and other incidental costs for the <br /> manufacturer's representative during the installation, testing, and instruction shall be borne <br /> by the Contractor at no cost to the Owner. <br /> END OF SECTION <br /> 044572017 <br /> 11934- 10 <br />