My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-276 D
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-276 D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 10:29:43 AM
Creation date
10/1/2015 12:34:52 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/09/2008
Control Number
2008-276 D
Agenda Item Number
8.DD.
Entity Name
Interstate Engineering Corp.
Subject
South RO Water Treatment Plant Improvements Material and Equipment
Area
South RO Water Treatment Plant
Project Number
UCP 2859
Bid Number
2008027
Supplemental fields
SmeadsoftID
7558
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. The locations of equipment and devices shown on the Drawings are approximate only. Exact <br /> locations shall be as approved by the Engineer during construction. Obtain in the field all <br /> information relevant to the placing of electrical work and in case of any interference with other <br /> work, proceed as directed by the Engineer and furnish all labor and materials necessary to <br /> complete the work in an approved manner. <br /> G . Circuit layouts shown are not intended to show the number of fittings , or other installation details . <br /> Furnish all labor and materials necessary to install and place in satisfactory operation all power, <br /> lighting, and other electrical systems shown . Additional circuits shall be installed whenever <br /> needed to conform to the specific requirements of the equipment . <br /> H . All floor mounted electrical equipment, including but not limited to motor control centers, <br /> transformers , control panels , etc . , shall be placed on a four inch (4 " ) concrete housekeeping pad. <br /> I. All connections to equipment shall be made as shown, specified, and directed and in accordance <br /> with the approved shop drawings . <br /> J. Provide and place all sleeves for conduits penetrating floors , walls; partitions , etc . Locate all <br /> necessary slots for electrical work and form before concrete is poured . <br /> K. All cutting and patching necessary throughout the existing site shall be done in a thoroughly <br /> workmanlike manner. <br /> 1 .07 HANDLING OF EQUIPMENT <br /> A. The equipment shall be kept upright at all times. When equipment has to be tilted for ease of <br /> passage through restricted areas during transportation and installation, the Manufacturer shall be <br /> required to brace the equipment suitably, to insure that the tilting does not impair the functional <br /> integrity of the equipment. <br /> 1 .08 COMPONENT INTERCONNECTIONS <br /> A. Component equipment furnished under this Specification will not be furnished as integrated <br /> systems. <br /> B . Analyze all systems components and their shop drawings; identify all terminals and prepare <br /> drawings or wiring tables necessary for component interconnection. <br /> 1909 MATERIALS <br /> A. The materials used in all systems shall be new, unused, of the manufacturer' s latest design, and as <br /> hereinafter specified. All materials where not specified shall be of the very best of their <br /> respective kinds. Samples of materials or Manufacturer's Specifications shall be submitted for <br /> approval as required by the Engineer. <br /> B . Materials and equipment used shall be Underwriters Laboratories, Inc. listed. <br /> l <br /> 044572017 <br /> 16050 - 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.