My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-276 D
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-276 D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 10:29:43 AM
Creation date
10/1/2015 12:34:52 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/09/2008
Control Number
2008-276 D
Agenda Item Number
8.DD.
Entity Name
Interstate Engineering Corp.
Subject
South RO Water Treatment Plant Improvements Material and Equipment
Area
South RO Water Treatment Plant
Project Number
UCP 2859
Bid Number
2008027
Supplemental fields
SmeadsoftID
7558
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C . Electrical equipment shall at all times during construction be adequately protected against <br /> mechanical injury or damage by water. Electrical equipment shall not be stored out-of-doors. <br /> Electrical equipment shall be stored in dry permanent shelters . If any apparatus has been <br /> damaged, such damage shall be repaired by the Contractor at his own cost and expense . If any <br /> apparatus has been subject to possible injury by water, it shall -be thoroughly dried-out and put <br /> through such special tests as directed by the Engineer, at the cost and expense of the Contractor, <br /> or shall be replaced by the Contractor at his own expense . <br /> D . All electrical panels , enclosures , raceways , conduits , wireways , boxes , cabinets , etc . , shall be <br /> fabricated of metal , Non-metallic substitutes are not acceptable . This does not apply to buried <br /> work. <br /> 1 . 10 SHOP DRAWINGS <br /> A. Shop drawings shall be submitted for approval of all materials , equipment, apparatus, and other <br /> items as required by the Engineer. <br /> B . Shop drawings shall be submitted for all equipment supplied under Division 16 of the <br /> specifications . <br /> C . Prior to submittal by the Contractor, all shop drawings shall be checked for conformance with the <br /> Contract requirements . Shop drawings shall bear the date checked, checker ' s name and <br /> indication of approval. Provide an itemized list noting all discrepancies with the Specifications <br /> and Drawings . Shop drawings not so checked and noted shall be returned. <br /> D . The Engineer's check shall be only for conformance with the design concept of the project and <br /> compliance with the Specifications and Drawings . <br /> E. No material shall be ordered or shop work started until the Engineer's approval of shop drawings <br /> has been given . <br /> 1 . 11 WARRANTY <br /> A. All equipment furnished and installed, and all work performed under Division 16 shall be <br /> guaranteed by the Contractor against defects of workmanship, materials, and proper installation <br /> for a minimum period of one ( 1 ) year from date of acceptance. This time shall be increased to the <br /> periods stated within individual specification sections as required. <br /> 1 . 12 RECORD DRAWINGS <br /> A. As the work progresses, legibly record all field changes on a set of project Contract Drawings. <br /> When the project is complete, furnish a complete set of "as built" drawings for the project record <br /> documents. <br /> i <br /> 044572017 <br /> 16050 - 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.