Laserfiche WebLink
C . Electrical equipment shall at all times during construction be adequately protected against <br /> mechanical injury or damage by water. Electrical equipment shall not be stored out-of-doors. <br /> Electrical equipment shall be stored in dry permanent shelters . If any apparatus has been <br /> damaged, such damage shall be repaired by the Contractor at his own cost and expense . If any <br /> apparatus has been subject to possible injury by water, it shall -be thoroughly dried-out and put <br /> through such special tests as directed by the Engineer, at the cost and expense of the Contractor, <br /> or shall be replaced by the Contractor at his own expense . <br /> D . All electrical panels , enclosures , raceways , conduits , wireways , boxes , cabinets , etc . , shall be <br /> fabricated of metal , Non-metallic substitutes are not acceptable . This does not apply to buried <br /> work. <br /> 1 . 10 SHOP DRAWINGS <br /> A. Shop drawings shall be submitted for approval of all materials , equipment, apparatus, and other <br /> items as required by the Engineer. <br /> B . Shop drawings shall be submitted for all equipment supplied under Division 16 of the <br /> specifications . <br /> C . Prior to submittal by the Contractor, all shop drawings shall be checked for conformance with the <br /> Contract requirements . Shop drawings shall bear the date checked, checker ' s name and <br /> indication of approval. Provide an itemized list noting all discrepancies with the Specifications <br /> and Drawings . Shop drawings not so checked and noted shall be returned. <br /> D . The Engineer's check shall be only for conformance with the design concept of the project and <br /> compliance with the Specifications and Drawings . <br /> E. No material shall be ordered or shop work started until the Engineer's approval of shop drawings <br /> has been given . <br /> 1 . 11 WARRANTY <br /> A. All equipment furnished and installed, and all work performed under Division 16 shall be <br /> guaranteed by the Contractor against defects of workmanship, materials, and proper installation <br /> for a minimum period of one ( 1 ) year from date of acceptance. This time shall be increased to the <br /> periods stated within individual specification sections as required. <br /> 1 . 12 RECORD DRAWINGS <br /> A. As the work progresses, legibly record all field changes on a set of project Contract Drawings. <br /> When the project is complete, furnish a complete set of "as built" drawings for the project record <br /> documents. <br /> i <br /> 044572017 <br /> 16050 - 4 <br />